Your NorthLink ferry can still be leaving Aberdeen on Tuesday and still not get you to Shetland. NorthLink’s October 26 service update cancels the Lerwick call on the October 27 northbound sailing and the evening sailing from Lerwick to Aberdeen because of forecast adverse weather.
The crucial exception is the Tuesday 5 p.m. departure from Aberdeen: Hjaltland will sail to Kirkwall in Orkney only, then return to Aberdeen. That is a retained crossing for Orkney passengers, not a substitute route that NorthLink says will deliver Shetland passengers to their booked destination.
If you are planning the crossing, our Aberdeen to Shetland ferry guide explains the wider route. For this disruption, the dated operator notice and your actual booking take priority over the ordinary timetable. Check the destination as carefully as the departure time.
Archival July 7, 2023 photograph of Hjaltland at Lerwick’s Holmsgarth Ferry Terminal. This is vessel context, not the October 2026 disruption, current sea conditions or the vessel’s current location.
- Tuesday, October 27: Aberdeen’s 5 p.m. Hjaltland sailing goes to Kirkwall only; the Lerwick call is cancelled.
- From Shetland: Tuesday’s 7 p.m. Hrossey sailing from Lerwick to Aberdeen is cancelled.
- Monday, October 26: Departures move earlier to 5 p.m. from Aberdeen and 4 p.m. from Lerwick.
- Scope: Specific passenger sailings, not a confirmed shutdown of every NorthLink route.
A Departure Is Not a Promise to Reach Shetland
Hjaltland was scheduled to leave Aberdeen at 5 p.m. Tuesday for Kirkwall’s Hatston Pier and Lerwick. NorthLink’s newer Aberdeen notice says the Lerwick call is now cancelled. The ship will leave at the same time but turn around after Orkney, departing Kirkwall for Aberdeen at 11:45 p.m.
The published plan gives a 7 a.m. arrival in Aberdeen on Wednesday, October 28. That is the expected arrival for this return from Kirkwall. It is not a statement that the Aberdeen to Shetland service resumes at 7 a.m., nor a new departure option for someone waiting in Lerwick.
Shetland News’s October 26 report also sets out the Tuesday Shetland cancellations and the retained Aberdeen to Kirkwall trip. For a traveler, the practical check is straightforward: ask whether the revised sailing still reaches the destination on your ticket before making the trip to the terminal.
Monday’s Boarding Plan Has Already Moved
There is an earlier deadline for passengers traveling today, October 26. Hrossey’s northbound departure from Aberdeen moves from 7 p.m. to 5 p.m., sailing via Kirkwall to Lerwick. The operator describes the added routing as providing northbound resilience following previous cancellations.
Aberdeen passenger and car check-in opens at 3 p.m. and closes at 4:30 p.m. NorthLink recommends that drivers check in at least an hour before departure. A booking email showing the former 7 p.m. departure is not a safe basis for a late-afternoon arrival at the port.
In the other direction, Monday’s Hjaltland departure from Lerwick moves from 5:30 p.m. to 4 p.m. Check-in opens at 2:30 p.m. and closes at 3:30 p.m. The operator expects a Kirkwall arrival at 10 p.m., possibly with minor delays, and an Aberdeen arrival at 7 a.m. Tuesday. Those are scheduled expectations, not a report that the ship has already arrived.
Read the Timestamp, Not Just the Port Heading
The operator page contains separate updates for Aberdeen, Kirkwall and Lerwick. At our check, the Aberdeen section was updated Monday at 9:37 a.m. and the Lerwick section at 10 a.m.; the Kirkwall section still carried a Sunday 11:30 p.m. timestamp.
That older Kirkwall section described Tuesday’s northbound 11:45 p.m. sailing to Lerwick as under review. The newer Aberdeen notice instead confirms the cancelled Lerwick call and an 11:45 p.m. return from Kirkwall to Aberdeen. Do not treat the older under-review line as confirmation of an onward Shetland connection. Use the latest dated notice and confirm your booking with NorthLink.
The distinction matters beyond this one sailing. NorthLink’s broad warning flags possible disruption from October 26 through October 29; it does not cancel every departure in that window. Its separate Pentland Firth notice says Tuesday morning sailings are expected to operate, potentially with weather delays, while Tuesday afternoon sailings are under review with a high probability of cancellation. Orkney is not an all-clear alternative across every route.
Sort the Booking Before Chasing a Backup
If your Tuesday ticket is for Shetland, contact NorthLink about the revised arrangements rather than assuming boarding the retained Kirkwall sailing completes the trip. The service page lists 0800 111 44 22 from UK landlines and mobiles, or +44 1856 885500 internationally. Have the booking reference, travel direction and passenger or vehicle details ready.
We have not verified a universal refund waiver, replacement accommodation, a guaranteed berth on the next sailing or a confirmed onward connection from Orkney. Ask the operator what applies to your booking before paying for a separate alternative. A published ship movement and an available passenger space are different questions.
Check the latest service notice again before leaving for the port, particularly if your plan depends on a later departure this week. Monday’s revised departure times and Tuesday’s confirmed cancellations are different statuses; neither establishes when every affected service will return to its usual timetable.
| Your Booking | What to Check Now |
|---|---|
| Tuesday Aberdeen to Lerwick | The Lerwick call is cancelled; the ship goes to Kirkwall only. |
| Tuesday Lerwick to Aberdeen | The 7 p.m. Hrossey sailing is cancelled; ask about your booking. |
| Monday Aberdeen or Lerwick departure | Use the earlier departure and check-in times, not the original email. |
| Orkney or a later-week sailing | Check that specific route and dated update; no blanket all-clear. |
Destination first: Tuesday’s retained Aberdeen departure does not reach Shetland.
Earlier today: Monday passengers have new boarding deadlines on both sides of the crossing.
Are NorthLink’s Shetland sailings cancelled on October 27?
The operator cancels Tuesday’s Lerwick call on Hjaltland from Aberdeen and the 7 p.m. Hrossey sailing from Lerwick to Aberdeen. The Aberdeen departure still sails to Kirkwall only.
Does the Kirkwall sailing provide a replacement connection to Shetland?
Not in the confirmed revised plan. Hjaltland returns from Kirkwall to Aberdeen at 11:45 p.m.; do not rely on the older under-review Lerwick listing as an onward connection.
What time do Monday’s ferries leave?
The October 26 notices move Aberdeen’s departure to 5 p.m., with final check-in at 4:30 p.m., and Lerwick’s to 4 p.m., with final check-in at 3:30 p.m. All times are local.
Are all NorthLink ferries cancelled through October 29?
No blanket cancellation is stated. The broader period carries a possible-disruption warning. Check the exact route, day and latest operator update before traveling.
Image Credits
- Lead Photo
PaulT (Gunther Tschuch) · CC BY-SA 4.0 · cropped, adjusted












