Three Cruise Ships and two sailing ships · Mike McBey · CC BY 2.0 · edited
Italian port companies, Port System Authorities, and firms that apply the national ports labor contract are listed for a 24-hour national stoppage on Monday, September 28, 2026, according to the Italian Ministry of Infrastructure and Transport strike register updated September 20. USB Mare e Porti filed the action on September 14, and the ministry logged it the same afternoon as a nationwide maritime strike covering the whole country.
If you have a cruise call, a ship change, or a same-day transfer through an Italian port that Monday, treat September 28 as a check-before-you-go date, not a guaranteed skip. Start with your line’s day-of notice and the terminal plan in our Rome cruise port guide for Civitavecchia, then confirm coaches, tenders, and luggage handling before you leave the hotel. Virgilio Motori’s September 2026 strike calendar, published September 20, repeats the same 24-hour national maritime listing for port-sector companies.
- Date: Monday, September 28, 2026, listed as 24 hours.
- Who called it: USB Mare e Porti, filed September 14.
- Who is listed: Port companies under Law 84/1994 articles 16, 17, and 18, Port System Authorities, and firms on the ports contract.
- Where: National, all of Italy, per the ministry register.
- Traveler move: Recheck cruise calls and terminal plans that day; do not assume a cancelled call unless your line says so.
USB Listed a National 24 Hour Stoppage for September 28
The ministry register is the legal public notice board for transport strikes in Italy. On the September 20 update it shows USB Mare e Porti against “aziende settore portuale,” the port-sector companies, for 24 hours on September 28, with relevance marked national and the region marked as all of Italy. The proclamation date and the receipt date are both September 14, with the receipt time logged at 16:08.
That filing is still on the current board eight days before the date. Italian strike notices can be suspended, narrowed, or left in place after talks, so the live register is the document to re-read in the 12 hours before you travel, not a screenshot from mid-September. As of the September 20 update used for this report, the September 28 port listing had not been withdrawn.
The same calendar also lists a four-hour local bus stoppage at Air Campania in Naples from 08:00 to 12:00 that Monday. That is a separate local public-transport action. It does not expand or shrink the national port listing, and it is not a reason to assume every Naples cruise berth will close.
Port Companies, Labor Pools, and Authorities Sit in Scope
The ministry’s category line is specific. It names enterprises under articles 16, 17, and 18 of Law 84/1994, the Port System Authorities known as ADSP, and companies that apply the national ports labor contract, the CCNL Porti. In plain terms, that is licensed terminal operators, the firms that supply temporary dock labor, other authorized port companies, the public authorities that run the port estate, and workplaces bound to the ports contract.
That list is about who may stop work, not a roster of named cruise brands. A named line, terminal operator, or passenger building is closed only when that company’s own notice, or an authority notice that names the exact facility, says so. The ministry listing does not name Costa, MSC, Royal Caribbean, or any other brand, and this report does not transfer the stoppage onto those brands.
Passenger terminals at some Italian cruise ports are run by dedicated companies. Some of those firms sit inside the ports contract; others sit on different contracts. If your booking names a terminal, use that terminal’s own page and your line’s app. If the listing does not name the building, write “operators working from the port,” not a closed-business claim.
Cruise Calls Need a Same-Day Check, Not an Assumed Skip
Italy remains one of the busiest cruise countries in the Mediterranean, with regular Monday calls at Civitavecchia for Rome, Naples, Genoa, Savona, Livorno, Venice, Bari, Palermo, Messina, La Spezia, and Salerno. A 24-hour port-labor stoppage can slow lines, luggage, stores, and shore-coach staging even when a ship is still alongside. It can also delay a tender or a same-day turnaround. It does not, by itself, prove that any one sailing will omit the port.
If you are already onboard and Italy is on the next-day program, watch the daily sheet and the shore-tour desk on September 27. Lines usually post a port swap, an extra sea day, or a shortened call in that channel first. Independent tours that meet the ship at the gate are the fragile piece: if dock labor or terminal staff run thin, a private driver may not be able to collect you on the usual timetable.
If you are flying into Rome Fiumicino or Ciampino and transferring to Civitavecchia that Monday, build slack. The port is about 80 minutes from the airports in normal traffic. Keep the cruise planning hub handy for the next port if the line later posts a substitute call.
This Date Is Separate From the September 26 Transport Strike
Deep Arrival already covered the September 26 Italy transport strike for rail and ferry. That Saturday action is a different stream: different date, different unions, and a different mix of trains and ferries. The September 28 listing is a Monday port-sector stoppage. Same country and same week do not make them the same event.
Travelers who rebooked around September 26 still have a second check on September 28 if the itinerary includes an Italian port. A rail recovery ticket does not speak to dock labor. A ferry that ran on Sunday, September 27, does not prove that Monday’s cruise terminal will staff a full passenger operation. Treat the two dates as two decisions.
The ministry board also still shows the September 30 ENAV and Techno Sky windows in the air sector. Those are air-traffic and technical-service listings, not this port story. Do not fold them into a cruise call plan unless your flights into Italy that week sit in those windows.
How to Confirm Status Before You Leave the Hotel
On the morning of September 28, read three sources in this order: your cruise line’s app or cabin notice, the terminal or port-authority page for the exact facility named on your boarding documents, and the ministry register if you need to see whether the national listing is still active. If the line says the ship is calling as scheduled, go, and carry extra time for the pier. If the line posts a skip or a delay, follow that notice, not a social-media list of “affected operators.”
Italy requires minimum services in many essential-transport strikes. The September 20 ministry row for this action states “24 ORE” and does not publish a guarantee-hour grid. Do not invent a morning window. If a port authority later posts guaranteed passenger slots, use that later notice. Until then, plan as if the full listed day is in play and let the line tell you what still runs.
Shore tours sold by the ship are the line’s problem to reroute. Tours you bought yourself are yours. Keep a backup walk that does not depend on a coach leaving the pier at 08:30, and do not prepay a second private transfer until the line confirms the call. If you hold a hotel night in Rome, Naples, or Genoa the evening of September 28, keep it.
| If you… | What to do |
|---|---|
| Have a cruise call in Italy on September 28 | Recheck the line and the named terminal before you leave; do not assume a skip. |
| Are already onboard sailing toward Italy | Watch the September 27 daily program and the shore-tour desk for a same-day change. |
| Booked an independent shore tour or driver | Confirm the operator can still meet the ship; keep a walking backup that does not need a coach. |
| Fly into Rome and transfer to Civitavecchia that Monday | Keep the flight; add slack for luggage and coaches at the port. |
| Have no Italian port call that day | This listing does not change your sailing; still separate it from the September 26 rail and ferry strike. |
September 14 is the filing date. USB Mare e Porti proclaimed the national port-sector stoppage that day, and the ministry received it at 16:08 the same afternoon.
September 28 is the 24-hour window. Recheck the live ministry register and your line the evening of September 27, then again before you leave for the pier.
September 29 is the first recovery morning. Watch for delayed luggage, late stores, and any makeup call the line posts after a shortened Monday visit.
Are Italian ports on strike September 28, 2026?
The ministry register lists a national 24-hour maritime stoppage that day for port-sector companies, Port System Authorities, and firms on the ports contract, called by USB Mare e Porti.
How long does the USB Mare e Porti stoppage last?
The listing is 24 hours on September 28, 2026. The row does not publish a shorter guarantee-hour grid.
Does this cancel my cruise call at Civitavecchia?
No. The listing names worker categories, not a cancelled ship. Only your cruise line can skip, delay, or keep a Civitavecchia call.
Is this the same as the September 26 Italy transport strike?
No. September 26 is a separate rail and ferry stream. September 28 is a Monday port-sector listing.
Which workers are listed in the ministry register?
Enterprises under Law 84/1994 articles 16, 17, and 18, Port System Authorities, and companies that apply the CCNL Porti contract.
What should I do the morning of September 28?
Read the cruise-line app, the named terminal page, and the live ministry register, then follow the line’s notice, not a third-party list of operators.














