Fremantle’s new road bridge over the Swan River opens on Sunday, Nov. 1, months ahead of schedule, and its opening day brings a walk-across festival, free shuttles and a round of transit changes. The Western Australian Government says the bridge will be called Walyalup Bridge, and pedestrians can walk across it during a free event from 9 a.m. to 1 p.m. before it opens to traffic that evening.
If you are in Perth or Fremantle this weekend, plan for crowds near the river on Sunday morning, no event parking, and changes to trains and buses from Nov. 1. Other big weekend closures around the world include those in our Melbourne Cup Day transport report.
- Opening: Sunday, Nov. 1; open to traffic Sunday evening.
- Walk-across festival: 9 a.m. to 1 p.m. Sunday, free, with no parking on site.
- Shuttles: Every 5 minutes from Stand 2 at Fremantle Station, 8:30 a.m. to 12:30 p.m.
- Fares: Public transport free for SmartRider and contactless users for the event.
- Transit changes: Extra Fremantle Line peak trains and the South Terrace free zone end Nov. 1.
A New Bridge for Fremantle
The new bridge replaces the Fremantle Traffic Bridge, built in 1939, and carries two lanes of traffic in each direction plus wider shared paths for people walking and cycling. It is jointly funded by the federal and Western Australian governments, and it is opening months ahead of schedule.
Walyalup is the traditional Whadjuk Noongar name for Fremantle. The state government says it comes from the Noongar word walyo, for the woylie, a small kangaroo rat once common in the local coastal scrub. State minister Rita Saffioti called the name a fitting choice for an iconic new landmark where the Swan River meets Fremantle Harbour.
Local leaders are pitching the opening as a community moment. Josh Wilson, the federal member for Fremantle, said the bridge “delivers a better and safer cross-river connection,” and local MP Lisa O’Malley called its opening “a historic moment for our community.” For readers following from overseas, 9 a.m. Sunday in Perth is 9 p.m. Saturday on the US East Coast.
Getting to the Opening Festival
The opening festival runs from 9 a.m. to 1 p.m. on Sunday, with food, family activities and entertainment, and people can walk across the bridge before cars are allowed on. There is no parking at the site. Transperth shuttle buses will run from Stand 2 at Fremantle Station every five minutes between 8:30 a.m. and 12:30 p.m.
Public transport is free for SmartRider and contactless users for the event, so the easiest way to get there is by train to Fremantle and then the shuttle. Expect busy trains on the Fremantle Line on Sunday morning and crowds around the station and the river.
Train and Bus Changes From Nov. 1
Transperth says several temporary measures that were added while the old bridge was closed end on Sunday, Nov. 1. The two extra weekday peak services between Fremantle and Perth, one in the morning and one in the afternoon, will be withdrawn. Standard bike rules return on trains, after bikes had been banned on peak trains between Fremantle and North Fremantle.
The free transit zone on South Terrace, between Douro Road and Fremantle Station, also ends on Nov. 1. Bus routes serving the Fremantle area may change from the same date, so check Transperth’s November service changes before you travel. The photo above is a July 2021 file image of the old Fremantle Traffic Bridge, right, and the railway bridge, seen from Cantonment Hill.
| If you… | What to do |
|---|---|
| Want to walk across the new bridge | Go Sunday between 9 a.m. and 1 p.m. and take the train and shuttle. |
| Plan to drive in Fremantle Sunday | Avoid the river area in the morning; there is no event parking. |
| Commute on the Fremantle Line | Expect the two extra peak trains to stop from Nov. 1. |
| Ride buses through Fremantle | Check Transperth’s November service changes for your route. |
Sunday morning, Nov. 1 brings the walk-across festival. Shuttles run from 8:30 a.m.
Sunday evening the bridge opens to traffic. Two lanes each way plus shared paths.
From Monday, Nov. 2 the temporary transit extras are gone. Check new bus timetables.
When does the new Fremantle bridge open?
Walyalup Bridge opens on Sunday, Nov. 1, with a walk-across festival from 9 a.m. to 1 p.m. and traffic allowed that evening.
Is there parking at the Walyalup Bridge opening?
No. Use the free shuttles from Stand 2 at Fremantle Station, every five minutes from 8:30 a.m. to 12:30 p.m.
What does Walyalup mean?
It is the Whadjuk Noongar name for Fremantle, from the word walyo, for the woylie, a small kangaroo rat.
What transit changes start on Nov. 1?
The two extra peak Fremantle Line trains and the South Terrace free transit zone end, and some bus routes may change.
Image Credits
- Lead Photo
Calistemon · CC BY-SA 4.0 · edited












