The Mount Hiei and Lake Biwa tourism notice, updated October 16, announced that the Eizan Cable and Eizan Ropeway would resume from first service on Saturday, October 17, after repair work and safety checks. The cable car had been suspended from September 30 for vehicle inspection and repairs.
Eizan Electric Railway’s October 15 notice also announced the October 17 restart for both lifts. These later notices supersede the open-ended planning status in the original October 5 article; check the operating schedule for your particular travel day.
- Earlier suspension: Eizan Cable and Eizan Ropeway from September 30, before the announced October 17 restart.
- Reason: inspection and repair of the cable car vehicles.
- Restart announcement: Both lifts were scheduled to return from first service October 17.
- Alternative to the lifts: Check the seasonal Kyoto bus route and its actual boarding stops and timetable.
- To Enryakuji: the same buses, or Keihan trains to Sakamoto and the Sakamoto Cable.
What the Earlier Suspension Covered
The tourism notice describes a cable-car suspension from September 30 for inspection and repair of the vehicles. Its October 16 update says repairs were completed and safety confirmed, and announces the same October 17 first-service restart for the cable car and the linked ropeway.
The October 16 tourism update gives a dated October 17 restart announcement. Kyoto Shimbun, the city’s main newspaper, ran the suspension as breaking news and noted in its headline that it lands at the busiest point of the tourist season. Check the operating information for your travel day; a restart announcement does not guarantee every later departure.
Alternative Ways to Reach Mount Hiei
The tourism association’s current access guide diagrams a seasonal direct bus route from Kyoto, including a Sanjo Keihan stop that not every service uses. Check the actual departure and boarding point, and confirm the last return service before setting out. The diagram is route-planning information, not a dated departure guarantee.
The access guide also diagrams the classic route from Demachiyanagi on the Eizan Electric Railway to Yase, then the Eizan Cable and Ropeway toward the summit. The October 17 announcement concerns the two lifts. Check the train and lift schedules separately before treating that connection as available on your travel day.
Getting to Enryakuji Through Sakamoto
For Enryakuji, the World Heritage temple complex on the mountain, the access guide diagrams a separate eastern route: Keihan trains to Sakamoto Hieizanguchi, a walk to Cable Sakamoto station, and the Sakamoto Cable toward the temple area. The seasonal Kyoto bus route is another option to compare against the actual timetable.
The Sakamoto Cable is run by a different company and is not affected. Its official site showed it operating normally on October 5, 2026, with hours that day from 8 a.m. to 5:30 p.m., and it is selling an autumn one day pass covering Enryakuji and the Sakamoto area. Hours can vary by date, so check the site on the day.
Planning an Autumn Visit to Mount Hiei
The Eizan Cable celebrated its 100th anniversary in December 2025, according to a Keifuku release, and Kyoto Shimbun framed the stoppage as a blow during the autumn tourist peak. For October or November plans, use the later October 17 restart announcement as the dated update to the suspension, then confirm the schedule for your day.
If you bought a ticket or pass covering the suspension period, ask the seller which refund or exchange conditions apply to that product and travel date. The later restart announcement does not establish a blanket refund right for every pass. For a new trip, check current lift and bus schedules.
| If you are | What to do |
|---|---|
| Going to the Mount Hiei summit | Compare the announced lift restart with seasonal bus options, then check the actual timetable and boarding point. |
| Visiting Enryakuji | Use the bus, or Keihan trains to Sakamoto and the Sakamoto Cable. |
| Holding a pass that includes the Eizan lifts | Ask the seller about refunds or exchanges. |
| Planning a trip later this autumn | Use the dated October 17 restart announcement and confirm current operating hours before leaving. |
October 17 restart announced. Both lifts were scheduled to return from first service, according to the later tourism update.
Compare the whole journey. Check current schedules for either the train-and-lift connection or the seasonal bus route.
Separate Shiga route. The access guide diagrams the Sakamoto connection to Enryakuji; check its current hours.
Is the Eizan Cable running in October 2026?
The later tourism update announced a restart for both lifts from first service October 17. The earlier suspension began September 30 for inspection and repairs. Confirm the operating schedule for the day you plan to travel.
When will the Eizan Cable and Ropeway reopen?
The tourism notice updated October 16 announced October 17 from first service. Eizan Electric Railway’s separate October 15 notice also gives that date. These are later updates to the original October 5 article.
How can I get to Mount Hiei from Kyoto without the Eizan Cable?
The tourism access guide diagrams a seasonal direct bus route from Kyoto and a separate Sakamoto route toward Enryakuji. Check the actual boarding stop, operating date and return timetable rather than assuming every bus uses each stop.
Is the Sakamoto Cable to Enryakuji affected?
No. The Sakamoto Cable is run separately and its site showed normal operation on October 5, 2026.
Image Credits
- Lead Photo
江戸村のとくぞう · CC BY-SA 4.0 · edited












