Rail trips to and from Brisbane Airport will take longer on Saturday, Nov. 7, and Sunday, Nov. 8, when inner-city track work closes the line through central Brisbane for the whole weekend. Translink, the Queensland transit agency, says railbuses replace trains between Bowen Hills and Banoon, Cannon Hill and Corinda stations from first service Saturday to last service Sunday, with normal service on Monday, Nov. 9.
Airport line trains run express between Roma Street and Albion via the Exhibition line, and Airtrain, which runs the airport rail service, says all its trips to and from the city and the Gold Coast are affected. Railbuses replace trains in Sydney’s Blue Mountains later this month too, as our Blue Mountains Line report explains.
- When: First service Sat., Nov. 7, to last service Sun., Nov. 8, 2026.
- Railbuses: Between Bowen Hills and Banoon, Cannon Hill and Corinda.
- Airport line: Express between Roma Street and Albion via the Exhibition line.
- Gold Coast: Gold Coast and Beenleigh lines run as one combined service.
- Bikes: Bikes and e-scooters not allowed on railbuses.
Getting to the Airport by Rail
Airtrain says the track work runs between Roma Street and Banoon stations and that railbuses replace trains in both directions. To reach the airport from the city, it advises taking a railbus to Roma Street and then a connecting train. From the Gold Coast or Beenleigh, take an all-stops train to Banoon, a railbus to Roma Street and then a connecting train to the airport.
Going the other way, airport travelers heading to the city take a train to Roma Street and then a railbus. Those heading to the Gold Coast or Beenleigh take a train to Roma Street, a railbus to Banoon and then a connecting all-stops train. Airtrain advises allowing extra travel time and checking where your station’s railbus stop is before you set off.
Other Lines Affected
Translink lists major changes on the Beenleigh, Ipswich and Rosewood, Springfield, Cleveland, Varsity Lakes and Nambour and Gympie North services. The Redcliffe Peninsula and Sunshine Coast lines run express between Roma Street and Eagle Junction via the Exhibition line. It lists minor changes on the Airport, Caboolture, Doomben, Ferny Grove, Kippa-Ring and Shorncliffe services.
Because the Gold Coast and Beenleigh lines run as a combined service, expect all-stops trains and longer trips between the Gold Coast and Brisbane that weekend. Normal fares and conditions apply on all scheduled services, according to Translink.
Planning Your Trip
Translink advises using its journey planner to find the fastest option. If you are flying out of Brisbane on Nov. 7 or 8 and normally take the train, leave well ahead of your usual time, especially from the Gold Coast, where the trip includes a train, a railbus and a second train. Times here are local Brisbane time, 15 hours ahead of New York.
Airtrain notes that it cannot guarantee the same level of accessibility during the work. For station access help, Queensland Rail can be reached on 13 16 17 or by text on 0428 774 636 during business hours, or Translink on 13 12 30. The photo above is a March 2021 file image of the Domestic Terminal station platform at Brisbane Airport.
Another Closure Later in November
Airtrain also lists a second closure on Saturday, Nov. 28, and Sunday, Nov. 29, again affecting its trips to and from the city and the Gold Coast between Roma Street and Banoon, with the same railbus connections. Translink says that closure covers the Beenleigh, Gold Coast and Cleveland lines from 11:30 p.m. on Friday, Nov. 27. For both weekends, Airtrain suggests keeping luggage on the seat beside you or under the seat on railbuses and asking the driver for ramp help if you need it.
| If you… | What to do |
|---|---|
| Fly from Brisbane Nov. 7 or 8 from the city | Railbus to Roma Street, then the airport train. |
| Fly from Brisbane from the Gold Coast | Train to Banoon, railbus to Roma Street, then the airport train. |
| Land in Brisbane that weekend | Allow extra time for the railbus leg into the city. |
| Travel with a bike or e-scooter | Plan another route; they are not allowed on railbuses. |
Saturday, Nov. 7 railbuses start at first service. Airport trains run express via the Exhibition line.
Sunday, Nov. 8 closure continues all day. Gold Coast trips need a train, railbus and second train.
Monday, Nov. 9 normal service returns. Trains resume from first service.
Is the Brisbane Airport train running Nov. 7 and 8?
Yes, but it runs express between Roma Street and Albion, and city connections use railbuses.
How do I get from the Gold Coast to Brisbane Airport that weekend?
Airtrain says take a train to Banoon, a railbus to Roma Street and then a train to the airport.
Can I take a bike on the railbus?
No. Translink says bikes and e-scooters are not permitted on railbuses.
When does normal service return?
From first service on Monday, Nov. 9.
Image Credits
- Lead Photo
Kgbo · CC BY-SA 4.0 · edited












