Independent travel intelligence. Sources cited on every guide. LatestYbor City Illuminated Knight Parade Returns Feb. 13, 2027, in TampaKorea Grand Sale Returns Dec. 23 With Deals for Foreign VisitorsZEL Cozumel, Rafael Nadal’s Resort With Meliá, Opens in MexicoPHL Expects 1,008,231 Thanksgiving Travelers: Plan Parking Now

Astoria-Megler Bridge Closes October 11: Check the 2.5 Hour Window

Astoria-Megler Bridge closes to vehicles October 11 from 8:30 to 11 a.m. PDT. Check the crossing window and earlier approach traffic before driving US 101.

ShareEmailWhatsAppLinkedInXFacebook
Astoria-Megler Bridge photographed June 28, 2024, before the October 11 2026 event closure

The Astoria-Megler Bridge will close to vehicle traffic from 8:30 to 11 a.m. Pacific Daylight Time on Sunday, October 11, 2026, for the Great Columbia Crossing 10K. Oregon’s transportation department says the US 101 closure applies in both directions, with emergency vehicles excepted.

For drivers crossing between Oregon and Washington, the immediate decision is when to reach the bridge, not whether to attend the race. If your Oregon Coast Highway road trip includes this crossing, compare your arrival with the closure window before committing to a timed stop. The route guide is planning context, not live traffic information.

At a Glance
  • Date: Sunday, October 11, 2026.
  • Vehicle closure: 8:30 to 11 a.m. PDT, northbound and southbound.
  • Exception: Emergency vehicles.
  • Earlier traffic: The local chamber warns of heavier approaches from 6 a.m.
  • Reopening: Normal traffic is expected shortly after 11 once participants have cleared; an immediate queue free crossing is not promised.

The Two and a Half Hour Closure Is for All Vehicles

The Oregon Department of Transportation’s bridge closure notice specifies a full closure of US 101 on the Astoria-Megler Bridge between 8:30 and 11 a.m. October 11. It is not a restriction limited to trucks, one lane or one travel direction.

ODOT distributed that notice September 8 at 8:15 a.m. PDT. The announcement is not new overnight, but its scheduled closure falls on Sunday morning. The current TripCheck road conditions report still lists the October 11 closure, including the same 8:30 to 11 a.m. operational window.

The commercial vehicle listing was updated October 10 at 16:00; that field does not label its time zone. Its separate date field starts at midnight, but the closure instructions specify 8:30 a.m. Drivers should use the stated closure hours, not mistake the administrative date field for an all night shutdown.

Before leaving, check the current notice for any changed instructions. A vehicle arriving during the scheduled closure cannot assume that a navigation app’s familiar US 101 route is passable. The emergency vehicle exception does not establish access for a private car with a tight reservation or an ordinary commercial delivery.

Approach Traffic Can Build Before the Bridge Closes

The Astoria-Warrenton Area Chamber of Commerce’s traffic advisory independently describes the event’s effect on local roads. It says more than 3,500 people are registered and warns of heavier traffic on the Oregon and Washington approaches beginning at 6 a.m.

The chamber lists participant shuttles beginning at 6:30 a.m. Those are event transport arrangements, not a promised replacement crossing for motorists or a general public bus service around the closure. Travelers should not interpret the race shuttle timetable as a way to move a vehicle across the river.

The distinction between approach congestion and the full closure matters. Planning to arrive just before 8:30 a.m. leaves little room for a slower approach. Conversely, the traffic warning from 6 a.m. does not mean the bridge itself closes at 6. Use the separate traffic and closure times when deciding whether to travel earlier or wait.

Eleven O’Clock Is Not a Guaranteed Clear Run

The official closure window ends at 11 a.m., while the chamber expects normal traffic shortly afterward once participants are clear. That is not a promise that a waiting driver will cross immediately at 11 or that every approach will be free of vehicles.

If the crossing connects with a tour, lunch reservation, campsite arrival or another timed commitment, check the supplier’s own arrival terms. The road closure does not automatically change those terms or establish a refund entitlement. Contact the supplier if the revised arrival looks uncertain before buying a replacement or abandoning a booking.

This report does not establish a verified alternative route, extra mileage or a reliable detour journey time. Forcing a suggested detour into a tightly scheduled trip without checking its suitability can replace one uncertainty with another. Commercial drivers also need to confirm that any alternative is authorized for their vehicle and load.

Choose the Crossing Time Before Starting the Trip

ODOT advises motor carriers to avoid the closure hours or use authorized alternatives. For other drivers, the same scheduled window makes an early crossing or a later departure worth considering, but neither choice guarantees a particular travel time. Check your actual route and the latest instructions rather than relying only on a saved journey estimate.

Keep the event and any future bridge construction separate. This closure is the October 11, 2026 Great Columbia Crossing, not a proposed bridge repair programme for a later year. A search result about future works is not an authority for Sunday’s access conditions.

Decision Matrix
If you… What to check
Expect to cross between 8:30 and 11 a.m. Change the crossing time or verify a suitable authorized alternative.
Plan to arrive shortly before 8:30 a.m. Account for heavier approach traffic possible from 6 a.m.
Have a timed reservation after crossing Confirm arrival terms; do not assume the closure changes the booking.
Drive a commercial vehicle Check the actual closure instructions and authorization of any alternative.
Planning Impact

A full crossing interruption. Both vehicle directions close for the stated Sunday morning window.

Two different clocks. Approach traffic may build before the full bridge closure begins.

Reopening is conditional on clearance. Do not promise a queue free crossing at exactly 11 a.m.

Frequently Asked

When does the Astoria-Megler Bridge close October 11?

The scheduled vehicle closure is 8:30 to 11 a.m. PDT on Sunday, October 11, 2026.

Is only one direction affected?

No. ODOT specifies the closure in both directions, with emergency vehicles excepted.

Does the bridge close at 6 a.m.?

No. Six a.m. is the chamber’s warning for heavier approach traffic, not the scheduled bridge closure start.

Will traffic be clear at exactly 11 a.m.?

That is not guaranteed. Normal traffic is expected shortly after 11 once participants have cleared, and waiting traffic can still affect your journey.

Image Credits

  • Lead Photo

Table of Contents

The weekly brief

One calm email. The week's plan.

Park hours, crowd outlook, fare moves, and what changed, plus first word as we open new destinations. No noise, just the planning signal.

Free. Unsubscribe anytime. We never sell your address.